Route 01
Seamless Knitting
Computerized seamless raschel machines knit tubes with compression zones programmed into the fabric — one-piece construction with no side seams for bodysuits, shorts and tops.
Seamless knitting, cut-and-sew and bonding sit under one roof. That is not a slogan — it decides which silhouettes we can build without subcontracting, how capacity flexes in peak season, and why your reorder lands in the same line that made the first lot.
Each route produces different silhouettes with different cost structures. The style matrix maps every style to its native route.
Route 01
Computerized seamless raschel machines knit tubes with compression zones programmed into the fabric — one-piece construction with no side seams for bodysuits, shorts and tops.
Route 02
Flat-knit and power-mesh panels cut to pattern and sewn on flatlock and overlock lines — the route for structured pieces: corsetry, hook-and-eye girdles, high-compression briefs.
Route 03
Ultrasonic and thermal bonding joins fabrics without thread — raw-cut edges that stay flat under clothing, used alone or combined with the sewing line.
Headline capacity is meaningless without a split. These are the working monthly figures we plan schedules around. demo figures pending verification
| Family | Monthly capacity | Peak-season flex |
|---|---|---|
| C-Shape bodysuits (seamless) | ~45,000 pcs demo | +15% with added shifts |
| T-Shape waist & girdles (cut & sew) | ~35,000 pcs demo | +20% seasonal line expansion |
| Air-Shape bottoms (seamless + bonding) | ~25,000 pcs demo | Bonding cells run two shifts |
| HP-Shape tops (mixed routes) | ~15,000 pcs demo | Shared with sewing line scheduling |
Combined capacity ~120,000 pcs per month across a 12,000 m² facility demo. Verified figures replace all demo values before launch — see About.
Three practical consequences buyers ask about — answered in operational terms, not marketing terms.
Reorders
Reorders run on the machine programs and patterns archived from your first order. The knit program ID and pattern version are recorded in your production file — your reorder reproduces the approved fit, not a cousin of it.
Peak season
For Q4 launches, capacity is booked against your PO date. If your window collides with booked slots, the quotation states the earliest realistic date instead of accepting and slipping later.
Multi-style programs
A range spanning bodysuits, waist trainers and bonded briefs ships as one consolidated order with one QC report set — because all three routes are in-house, not split across subcontractors.
On the floor
Factory tours are open to buyers with an active project or a signed NDA. If travel is not practical, a live video walk-through of the relevant line is scheduled within days of your inquiry — the same floor, no edited footage.
The three construction routes are in-house. Specialized trims — e.g. custom hardware or woven labels — come from audited external suppliers, but garment construction, dyeing coordination and finishing stay on our floor and under our QC system.
Machine programs are duplicated across the seamless fleet, so a program is re-loaded to another machine rather than waiting on repairs. If a genuine bottleneck appears, your merchandiser tells you the revised date the day it is known — not on the due date.
Yes — recurring programs reserve monthly slots against a rolling forecast. The reservation terms (forecast window, booking cutoff) are written into the program agreement so both sides plan on real numbers.
Send your target styles and quantities. We confirm which construction route each style takes, the capacity slot available, and the lead time that follows from it.