Sampling
Proto → PP in agreed rounds
Every sampling round has a cost and a date in the plan. Revisions beyond the agreed rounds are quoted before they start — never deducted from bulk silently.
Whether you arrive with a finished tech pack (OEM) or a written brief (ODM), the workflow from that point is the same: quote, sample, produce, inspect, ship. Here is each step with what you do, what we do, and what "done" means.
Dates in your quotation follow these steps. The guide Sampling, MOQ & Lead Times adds the day counts behind each one.
You: send target style, market, retail price, quantity and deadline. We: reply within one working day with a construction proposal, sampling plan and unit-price scenarios. Done means: you hold a written quotation valid for 30 days.
You: approve the proto, send fit comments, sign off the pre-production sample. We: build the pattern, source fabric, deliver proto and PP samples, run size-set fit sessions. Done means: a signed PP sample is the bulk standard.
You: confirm the deposit and final packaging specs. We: procure to spec, cut, sew, bond and assemble with inline QC at defined checkpoints, and share photo documentation at each stage. Done means: goods packed with inline reports on file.
You: book the forwarder or ask us to arrange shipping. We: run the final random inspection to the agreed AQL, compile documentation, and hand over or load the container. Done means: shipment documents and inspection report reach you with the tracking.
The difference between the two models concentrates in steps 1–2. This matrix shows who carries which milestone, so internal expectations match on both sides.
| Milestone | OEM | ODM |
|---|---|---|
| Tech pack | Supplied by you, sampled exactly | Built by our pattern office from your brief |
| Fabric & compression spec | Sourced to your specified weight and content | Proposed by our fabric technician, approved by you |
| Fit sessions | You lead with your fit model; we adjust | We lead with live models; you approve remotely with photos and fit reports |
| Pattern ownership | Yours from day one | Stated in the quotation before development |
| Bulk & QC | Identical: same inline checkpoints, same AQL, same reporting | |
These are the standards every order ships under — quoted up front, not negotiated after a problem.
Sampling
Every sampling round has a cost and a date in the plan. Revisions beyond the agreed rounds are quoted before they start — never deducted from bulk silently.
Inline QC
Inline inspection catches defects while they are still cheap to fix. Findings and corrections are logged in the production file you can audit any time.
Final inspection
The acceptance quality limit is written into the quotation. Third-party inspection is welcomed at final audit if your compliance program requires it.
Shipping
We work with your forwarder or arrange freight. Either way, commercial invoice, packing list and marks are prepared to your customs broker's requirements.
Timeline planning
Give us the launch date and we map the workflow backwards: when sampling must start, when the PP sample must be signed, when bulk must hit the line. If the window is not realistic, we say so in the first reply — with the earliest alternative.
The signed PP sample is the contract standard. If bulk deviates, the final inspection fails at our own gate before it reaches yours — goods are corrected, re-inspected, or the order is re-priced or cancelled per the terms in the quotation.
Yes. Inline visits and third-party inspections are scheduled through your merchandiser, and our QC reports are shared at every checkpoint regardless — you should never need an inspection visit to know where the order stands.
Any post-PP change — colour, trim, label, packing — goes through a written amendment with cost and schedule impact stated before it is executed. Verbal changes are not accepted in production, protecting both sides.
The workflow only moves as fast as its first reply. Send the four inputs and step one is done this week — quotation, sampling plan and honest lead times included.